Customization: | Available |
---|---|
After-sales Service: | on Site Service and Online Service by Video |
Warranty: | 12 Month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Main configuration | Indicator type | Specific parameters |
Vibrating silo | Function | It can combine piles of materials with shock-dispersing, on-demand output, and sorting machines to save space. |
Device speed | More than 200 bags/minute | |
Overall dimensions (specific details are subject to actual conditions) | L*W*H (mm) : 800 (L) X320 (W) X400 (H) | |
Maximum power | 350W | |
Total net Weight | 30kg | |
DXHL10 bag sorting machine | Function | It can realize the separation, steering, equal-spaced output, and counting of scattered accumulated material packages. |
Device speed | 150-220 bags/minute | |
Overall dimensions (specific details are subject to actual conditions) | L*W*H(mm):3457(L)X700(W)X1350(H) | |
Maximum power | 1.1kW | |
Air consumption | Continuous air consumption 0.6m³/min | |
Total net Weight | 400kg | |
DXHL10T same plane and the same direction machine | Function | 1. Remove stacked and connected packages, and then visually identify the materials; 2. Rotate materials that do not meet the front-to-back orientation requirements horizontally; 3. Turn materials that do not meet the front and back requirements 180 degrees; |
Device speed | 140-170 bags/minute | |
Overall dimensions (specific details are subject to actual conditions) | L*W*H (mm) : 2493(L)X600(W)X1258(H) | |
Maximum power | 4.4kW | |
Air consumption | Continuous air consumption 1 cubic meter/minute | |
Total net Weight | 200kg | |
Optional device: DXHL10F ball diverter | Features |
1. The horizontal shunt can solve the problem of secondary deformation of materials caused by extrusion and falling, and the problem of easy material blockage in large flow conditions;
2. The real-time dynamic diversion mechanism can solve the real-time and even distribution of multi-channel materials;
3. It can solve the waste of production capacity caused by insufficient material supply in the finishing system, and the increase in material blockage and defective rate caused by excessive material supply.
|
Equipment efficiency | Max. 600-1500 bags /minute |